Sienna have been privileged to work with MDL Marinas on a variety of projects and we were delighted to secure this exciting project to deliver new state-of-the-art sales units within Hamble Point Marina.

The project involved the construction of a new boat sales area along with extensive external improvement works to the surrounding area. 

Phase 1 - Hamble Point Marina - Boat Sales Area

  • Demolition of the existing raised walkway and associated single storey buildings.
  • Removal of existing concrete slabs to recycling facility.
  • Piling for the new building foundation.
  • Installation of the new building services including foul drainage system.
  • Breakout and removal of existing yard hard standing surfaces.
  • New surface water SUDS drainage system
  • Construction of a new raised walkway within the boat sales area.
  • Placement of new modular units.
  • Associated hard and soft landscaping.

 

Phase 2 - Hamble Point Marina Boat Storage Yard and Roadway

  • Realignment of the entrance roadway to allow greater access/egress to the marina.
  • New kerb edges.
  • New asphalt surfacing to road.
  • Removal of existing electrical power supplies.
  • Removal of existing overhead lighting columns.
  • Removal of redundant kerbing and timber edging throughout boat storage yard.
  • Expansion of the yard area along southern elevation.
  • Regrading of existing grass bunding along southern elevation to suit design.
  • Regrading of existing boat yard surface area to suit new design levels.
  • Construction of new concrete hard standing areas for boat storage.
  • New surface water interceptor and outfall.
  • Connection of existing surface water drainage system to new outfall.
  • Service duct runs to supply temporary power supplies throughout boatyard. 

 

Value: £2,000,000 

Completion: March 2019 